How to install electric heating in pigsty, and what matters to pay attention to?
In recent years , more and more pig seed breeding has become a rich project for the people, especially in Guangxi , Jiangxi , Guangdong and other places , many breeding factories in order to speed up the growth of pigs , deliberately use the way to heat the pig pen , for some breeding veteran experience , electric heating has played a certain role , for some novice breeding individuals . Not only the waste of electricity costs, but also some trouble in the use of the process , then the pig pen electric heating installation should pay attention to those problems ?
①Divide a large pig pen into several small pig pens in a planned way, with a single pen of about 2 square meters ( raising 1-2 pig seeds)
②Choose the electric heating system, it is recommended to choose the silicone heater as the heating body
③ Each small pig pen uses 18-20M hairline as the standard, and the power is 350W
④ Two small pig pens use a liquid crystal display temperature controller to control the temperature
⑤After the planning of the small pig pen is completed , start the ground leveling , install the insulation layer reflection film, remember that the installation direction is the heat upward reflection
⑥After the installation of insulation, begin to install wire mesh or fiber mesh, it should be noted that the size of each mesh should be consistent
⑦ The heating wire is evenly fixed on the fiber network, and the spacing of each heating wire should be consistent, and on the contrary, the hot wire is easy to appear uneven
⑧ After the installation of the heating wire, the temperature sensor is installed , and the number of each pig pen is 1-2 temperature sensors
⑨ If conditions permit , you can install a waterproof film on the top of the heating wire , which can extend the life of the heating wire , because pig urine will penetrate the cement layer after a long time , and bring great corrosion to the heating wire , especially the metal joint of the joint part
⑩After finishing the above action , the cement pouring can be , remember that the cement pouring can not be immediately general , must wait for 3-5 days, completely wait for the cement to dry after the electricity heating .
Pay attention to those matters after installation
1. Check and replace the temperature sensor regularly. It is recommended to replace the sensor after 18-24 months
2. Clean the garbage objects in the pig pen regularly, and clean them with clean water as far as possible
3. Keep the pen Ventilated & Dry
4. Temperature sensor supplement, it is recommended to install the temperature sensor head at the same time, the sensor head with a plastic tube to install, has been convenient for future replacement, only need to directly pull out to replace